178棋牌游戏中心

  1. <object id="uvyh5"></object>

    <output id="uvyh5"><source id="uvyh5"><i id="uvyh5"></i></source></output>

        <optgroup id="uvyh5"><input id="uvyh5"><button id="uvyh5"></button></input></optgroup>

      1. <meter id="uvyh5"></meter>
            <object id="uvyh5"><em id="uvyh5"><table id="uvyh5"></table></em></object>
          1. HOME> SOLUTIONS & PRODUCTS> Energy
            The Ability of Ensure Adequate Energy Supply

            South Open-Pit Coal Mine has a simple geological structure, shallow buried thick coal seam and, , stable and huge reserves.

            The designed capacity of South Open-Pit Coal Mine for Phase I is 10 million tons/year, Phase II 20 million tons/year. The design concept is green, digital and intelligent. Now TBEA has invested nearly 3 billion RMB to build million-tons open-pit coal mine production system. The Surface Production System act as an very important role of the production system: the ground production system mainly includes the crushing, storage, rail loading, auto loading and belt conveyor transportation production. Loading part includes two parts, the turn between train and truck station. TBEA has a train station including the buffer warehouse, quantitative warehouse, steel structure, sampling system, hydraulic system and control system with loading capacity of 5000 t/h. The gondola car just need 40 seconds single section loading time. The rail loading capacity is 10 Mt/a. And TBEA also have two fast-loading stations for trucks. The station bin has the capacity of 200 t. The warehouse has a loading gate with auto loading operations and set up a digital truck scale for measuring. The loading capacity of 1500 t/h. Within 8 minutes we can complete 100 ton truck shipment.

            Green Mining

            The Surface Production System with the capacity of 100 billion tons

            Automatic Loading System

            Services

            The items can be carried out: total moisture determination, determination of moisture, ash content, calorific value determination, determination of total sulfur and hydrocarbon and ash melting sex determination.

            IC Card Management

            Silo Quick Loading System

            Professional Technical Team

            Testing Equipment

            Blast Air Drying Oven

            Intelligent Muffle Furnace

            Eco-friendly

            In order to create green coal mine, the mine has a closed ground production system and the coal storage silo with over 58000 trees and green area of 23 hectares, to create green mines.

            Belt corridor: safe, environmental protection, energy saving . The coal conveying corridor have the ability to deliver 3000 tons per hour to guarantee the coal conveying requirements to reduce procurement costs and to achieve win-win purpose.

            Public transportation:saving time, reducing the risk of loss of goods, reducing the number of traffic accidents, ease traffic pressure;Saving freight cost;Reducing the transportation pressure on road;Driving the regional economic growth;Reducing the amount of pollution on the natural environment;

            Belt Corridor

            Belt Corridor

            Train Line

            Loading of the Container

            Train full of Containers leaving the Mine

            Copyright © 2019.178棋牌游戏中心 All rights reserved.www.1weg0.cn

            全民玩三张| 体彩开奖时间| 426棋牌APP| 龙皇棋牌官方下载| 体彩6十1开奖结果| ig棋牌官方下载